Bridging the Gap
Lake Fenton
15 April 2017
The new bridge over Lady Barron Creek is well underway and should
be completed very soon.  Our original
bridge built from a grant given by Foundation for National Parks & Wildlife was washed away in the floods of July
2016.
|  | 
| New bridge spanning Lady Barron Creek | 
It is one of those ironies of circumstances that by losing
the bridge allowed a higher quality replacement one from an insurance
claim.   The original design was rock and
gravel over 4 large pipes, whilst the new one is a high-level steel and wood
structure.  The pipes have been removed
and that will allow better water flow by reducing the chance of debris build-up
near the bridge.
|  | 
| Partly constructed bridge - the ends | 

Comments