Second Coat K Col Timber


Tuesday 10 December 2019

For the second coat of stain we had ideal weather with sun and a slight breeze. Again, there was seven working and it was all completed before lunch.  It looked likely that there might not be enough stain, but it just lasted the distance. Over the two days planks totalling 1.7 k in length were stained twice, using rollers.


Adrian and Greg K


Greg B and Trent


Tad outside his mill building with Greg B and K on right
 

Comments