Visitor Centre Area Maintenance
Saturday 18 September 2010
Got to the visitor centre to report in and then went to the workshop to collect the mini wire cutters. Dave brought a steel dropper remover and a special pair of wire pliers. We started work at 9.15 and finished at 5.30.The 3 of us had a system going and finished that enclosure by 12.15.
Started on the second enclosure and had lunch at 1.00 in one of the huts where Susan M. - a Discovery Ranger was talking about native foods - we had roo patties , damper, fetta and tea with Alpine Baeckea. We where keen to get the second finished so stuck at it and at about 5.00 Trevor Norris the new 2IC pulled up and introduced himself and stayed for a while and said that he had heard great things about what Friends of Mt Field had done. As we finished Reg alerted us to a third small enclosure very close to the river. (report from Greg)
Comments