Tarn Shelf Track Maintenance
Saturday 8 May 2010
Of the 10 bags of rock delivered by PWS to Tarn Shelf, we were able to lay 7 bags. The remaining 3 bags will be done shortly. At one deep bog existing cording was added to from the nearby stockpile and in this section some rocks were also added.
Unfortunately the weather was not the best for work, with a drizzle and cold wind for most of the time.
View from top of steps
Rocks in bog
Of the 10 bags of rock delivered by PWS to Tarn Shelf, we were able to lay 7 bags. The remaining 3 bags will be done shortly. At one deep bog existing cording was added to from the nearby stockpile and in this section some rocks were also added.
Unfortunately the weather was not the best for work, with a drizzle and cold wind for most of the time.
View from top of steps
Rocks in bog
Comments