K Col Hut November 2016

Tuesday 29 November 2016
A very good days work was put and the finished walls looked very nice and appropriate for a bush hut, even so there is one side of the loft remaining to do.  Zelko and Greg B did the down stairs remaining wall whilst Greg K was in the cramped loft, which meant lying on his side to work.
Some of the varnishing was carried out.

Weather was kind to us and it was pleasing to notice that the cushions plants are recovering where rocks have been added to the track.

Tarn Shelf and Rodway shelter hut from Rodway Range



Zelko and Greg measuring the timber



The original moldy and less than appealing wall.


The almost finished wall lining