In previous weeks Mount Field National Park had been hit by snow, storms and strong winds and the first evidence of this noticed was the scoring and other damage to the Lake Dobson Road.
In previous weeks Mount Field National Park had been hit by snow, storms and strong winds and the first evidence of this noticed was the scoring and other damage to the Lake Dobson Road.
It had been a long
time since Lake Fenton was seen full, but it was overflowing today and there
was a large pile of limb, branch and twig debris piled up and blocking the
drains going under the new bridge over Lady Barron Creek. The result was a
little minor gravel loss and we set about clearing all the debris away and
placing well out flood reach. It is surprising that so many bigger limbs are
still lying around the lake shore after all the time it has been there.
The plan we have
hatched is to lay large flat rocks on top as a pavement and use course crushed
rock to fill around and beside them. The
lighter path gravel used can be washed off with heavy water flow and it was
obvious that the creek had been forced to flow over the bridge removing some in
the process.
Kangaroo Moor |
With that unscheduled task out of the way work commenced on clearing fallen trees and bushes on the track between Lakes Fenton and Webster. A couple took quite an effort, especially dense old Banksia and a Eucalypt. Although the branches of one Eucalypt were removed, to make it easier to get over, the trunk had to be left as we are not permitted to use a chainsaw. During the walk some small sections of overgrowing vegetation were trimmed.
Cutting the final bits of the large Banksia |