Platypus Tarn
Saturday 21 July 2012
The remaining part of the track was cleared and the short muddy section was further drained and rocks added. A large step-up was also rocked to reduce the height.
Wire was put on the boardwalked sections of the track almost as far as Lake Seal turnoff. Not all the wire was used and the balance was held for future use on the track.
Rocks steps placed in large step down on track